This 2nd floor apartment is located in a building complex in the highly sought-after area of Kifisia, with easy access to the centers of Kifissia, Politeia, and Kefalari. The apartment offers a total living area of 158m2 and is designed with energy efficiency in mind, achieving a class A rating.
The apartment comprises a spacious living room and dining area, as well as a modern kitchen with Corian countertops and an open island. The master bedroom has an attached bathroom, while there are two additional bedrooms and a separate bathroom for guests. A guest WC is also included.
The apartment's design includes high-quality finishes and materials, including marble cladding on the exterior and the option for wooden cladding on the interior. The floors are made of beautiful oak wood, while the dry building system ensures a comfortable and healthy living environment.
Other notable features of the apartment include underfloor heating, an energy-efficient fireplace, thermal insulated facade and frames, and energy-efficient glass panes. The apartment is also equipped with a fire detection system, a gas boiler, and a security door, as well as an alarm system.
For added convenience, the apartment includes an underground parking space and a storage room of 10 square meters. There is also infrastructure in place for an air-conditioning system and an electric car charger.
The apartment's spacious balconies provide a beautiful outdoor living area, perfect for entertaining guests or relaxing after a long day. Overall, this apartment offers a luxurious and comfortable living experience, with high-quality finishes and a focus on energy efficiency and modern design.
Features
• 3 Bedrooms
• 1 Bathroom
• Guest WC
• Spacious balconies
• Underground parking space
• Storage room 10 sq.m.
• Design for energy class A
• Underfloor heating
• Energy fireplace
• Thermal insulated facade
• Thermally insulated frames
• Energy efficient glass panes
• Fire detection
• Gas boiler
• Security door
• Alarm system
• Infrastructure for air-conditioning system
• Infrastructure for electric car charger
Estimated Delivery: September 2023